Carrillo, P and Heavey, I (2000) UK contractors’ acquisitions strategy for Central and Eastern Europe. Engineering, Construction and Architectural Management, 7(03), 322–8.

Griffith, A (2000) Integrated management systems: a single management system solution for project control?. Engineering, Construction and Architectural Management, 7(03), 232–40.

Lahdenperä, P and Tanhuanpää, V-P (2000) Creation of a new design management system based on process optimization and proactive strategy. Engineering, Construction and Architectural Management, 7(03), 267–77.

Lam, K C, Ng, S T, Hu, T, Skitmore, M R and Cheung, S-O (2000) Decision support system for contractor pre-qualification—artificial neural network model. Engineering, Construction and Architectural Management, 7(03), 251–66.

Li, H, Love, P E D and Drew, D S (2000) Effects of overtime work and additional resources on project cost and quality. Engineering, Construction and Architectural Management, 7(03), 211–20.

Nicholas, J, Holt, G D and Mihsein, M (2000) Forecasting construction materials suppliers’ financial turnover. Engineering, Construction and Architectural Management, 7(03), 221–31.

Ofori, G and Chan, S L (2000) Growth paths of construction enterprises in Singapore, 1980–98. Engineering, Construction and Architectural Management, 7(03), 307–21.

Palaneeswaran, E and Kumaraswamy, M M (2000) Benchmarking contractor selection practices in public-sector construction—a proposed model. Engineering, Construction and Architectural Management, 7(03), 285–99.

Sarshar, M, Haigh, R, Finnemore, M, Aouad, G F, Barrett, P, Baldry, D and Sexton, M (2000) SPICE: a business process diagnostics tool for construction projects. Engineering, Construction and Architectural Management, 7(03), 241–50.

Walker, D H T and Vines, M W (2000) Australian multi-unit residential project construction time performance factors. Engineering, Construction and Architectural Management, 7(03), 278–84.

  • Type: Journal Article
  • Keywords: construction time performance; procurement; risk; team behaviour
  • ISBN/ISSN: 0969-9988
  • URL: http://www.blackwell-synergy.com/links/doi/10.1046/j.1365-232x.2000.00159.x/abs
  • Abstract:
    Construction time performance (CTP) factors recently identified in work commissioned by the Construction Industry Institute Australia (CIIA) indicate that project team effectiveness significantly influences CTP. Project complexity also was found to significantly contribute to CTP. However, no residential projects were studied in that survey. This paper reports upon CTP research undertaken into Australian multi-unit residential construction that fills this theory gap. Results indicate that the construction management (CM) team's effectiveness in managing the construction process has a major but not predominant role in influencing CTP. Team communication effectiveness and teamwork factors are also essential factors influencing CTP. Other factors found to affect CTP include: design team's management style; intra-team working relationships; the degree of experience and expertise for the same type and size of project; procurement method; and the level of the CM team's current workload.

Woodhead, R M and Male, S P (2000) The conditioning effect of objective decision-making on the client's capital proposal. Engineering, Construction and Architectural Management, 7(03), 300–6.